Latest news
Featured
Recent
Manufacturing large-format precast concrete panels requires more than simply having a large moulding surface. When panels exceed 17 metres in...
A large-scale project that once again places Moldtech’s engineering expertise and manufacturing capabilities at the service of the international precast...
Moldtech has developed an automated circulation line for the internal transport, positioning and transfer of precast concrete bathroom pods at...
Moldtech is simultaneously carrying out the installation and commissioning of nine projects in France, Spain, Canada, Romania, Argentina and Ghana....
A new installation designed to strengthen the production of precast façades for Portugal’s growing residential market Moldtech has successfully completed...
A solution engineered for the production of large-capacity I-girders and TT slabs Moldtech has successfully completed the installation and commissioning...
Two modular tilting tables for the production of prestressed panels have been supplied to a U.S. plant, reflecting the sector’s...
Moldtech has completed the supply and installation of a 40-metre self-supporting TT mould in Algeria, designed for the production of...
A plant commissioned in 2006, progressively expanded, continues operating with original equipment in a multiproduct production environment for structural elements...
- 16 January 2026
- Noticia
- 12 January 2026
- Noticia
- 9 January 2026
- Noticia
- 5 January 2026
- Noticia
- 10 December 2025
- Noticia
- 3 December 2025
- Noticia
- 26 November 2025
- Noticia
- 24 November 2025
- Noticia
- 19 November 2025
- Noticia
- 12 November 2025
- Noticia
- 5 November 2025
- Noticia
- 22 October 2025
- Noticia
- 20 October 2025
- Noticia
