Latest news

Recent

news
September 7, 2026

Manufacturing large-format precast concrete panels requires more than simply having a large moulding surface. When panels exceed 17 metres in...

news
September 3, 2026

A large-scale project that once again places Moldtech’s engineering expertise and manufacturing capabilities at the service of the international precast...

news
September 2, 2026

Moldtech has developed an automated circulation line for the internal transport, positioning and transfer of precast concrete bathroom pods at...

news
July 14, 2026

Moldtech is simultaneously carrying out the installation and commissioning of nine projects in France, Spain, Canada, Romania, Argentina and Ghana....

news
June 9, 2026

A new installation designed to strengthen the production of precast façades for Portugal’s growing residential market Moldtech has successfully completed...

news
June 1, 2026

A solution engineered for the production of large-capacity I-girders and TT slabs Moldtech has successfully completed the installation and commissioning...

news
April 29, 2026

Two modular tilting tables for the production of prestressed panels have been supplied to a U.S. plant, reflecting the sector’s...

news
April 21, 2026

Moldtech has completed the supply and installation of a 40-metre self-supporting TT mould in Algeria, designed for the production of...

news
April 13, 2026

A plant commissioned in 2006, progressively expanded, continues operating with original equipment in a multiproduct production environment for structural elements...

Scroll to Top