STATIONARY TABLES FOR HALF-SLABS FOR BRIDGE DECKS FOR CEBU CORDOVA LINK EXPRESSWAY

Facebook
Twitter
LinkedIn
WhatsApp
Email

Moldtech has recently built and installed 3 stationary tables in Philippines for the production of half-slabs to build the bridge decks of the iconic Cebu-Cordova Link Expressway bridge, which will connect Cebu City with Cordova town on Mactan Island.

The project, an important milestone in the country´s infrastructure and an impressive engineering marvel, is being built by a consortium comprised of Spain-based Acciona and two local partners, First Balfour and DMCI.

This joint Venture entrusted Moldtech the design, fabrication and installation of these tables in a temporary facility at construction site. The tables have been designed and built according to client´s requirements, with 35×2,5m size and with two collapsible side shuttering bands. The tables also feature a pneumatic vibration system.

Together with the tables Moldtech has also designed and supplied different types of magnetic shutters for a flexible production of different sizes of slabs.

After the installation of the equipment and training of local workers, the tables have been working at full performance to allow the client to meet the demanding execution deadlines.

 

Do you want more information?
Contact an expert from our team now

Related Articles

What Are Tilt Up Walls? Tilt up walls are precast concrete panels manufactured by pouring concrete horizontally on-site, which are...

Captivating Overview of Concrete Tilt-Up Buildings When it comes to modern commercial buildings, concrete tilt-up buildings stand out for their...

Why Tilt-Up Concrete Walls Matter Today We all know that speed and durability are key in modern construction projects. That’s...

Load more

Moldtech Products

Accesorios y equipos auxiliares
Casting beds and moulds for prestressed girders and beams
Accesorios y equipos auxiliares
Load more
Scroll to Top