• A 100-meter-long universal bed base with a working capacity of up to 650 tons.
  • A set of mold sides for the production of “L”, “T” and “rectangular” beams of 36 meters long.
  • Two masks for prestressing of 650 tons.
  • Two lifting rockers of 5 meters in length with 25 tons capacity each.
  • Two concrete transport and pouring hoppers with 2 m3 capacity.
  • A vibrating screed of 4.5 meters long.
Do you want more information?
Contact an expert from our team now

Related Projects

The 3F200 BARRIER MOULD is composed of two side panels, one upper insert and...
The tilting table is composed of three modules, each measuring 12 m in length...
The tilting table consists of one module measuring 13 m in length and 4.5...
Side form mould designed for the production of precast concrete I-girders, engineered for operation...