TWO SELF-REACTING PRESTRESSING LINES OF 1500 TONNES

The self-reacting lines provided are designed to meet the high strength, precision, and repeatability requirements necessary for heavy-duty infrastructure beams. Their configuration includes:

  • Self-reacting structure, 92 meters long, designed to withstand high reaction forces.
  • Hydraulic casting bed, 85 meters long and 3.8 meters wide, to accommodate sections with significant geometric variations.
  • Interchangeable bottoms 950 mm and 500 mm, allowing for the manufacture of different beam types.
  • Active and passive stressing heads bearing with a combined reaction capacity of 1,500 tons, suitable for high-force tensioning equipment.
  • Hydraulic detensioning unit, ensuring controlled and safe processes.
  • Side moulds suitable for large I-beams.
  • Complementary systems for tensioning, concreting, and detensioning within a rigid and traceable industrial cycle.

This equipment will allow the manufacture of beams 42.50 meters long, 2.20 meters high and weighing approximately 100 tons, essential precast elements to resolve the viaducts of the section and ensure the continuity of the route with a robust and repeatable structural solution.

Do you want more information?
Contact an expert from our team now

Related Projects

Installation comprising six 17.3 × 4 m tilting tables, with a shared hydraulic power...
Moldtech has designed and manufactured 24 modular tilting tables measuring 24 × 3.5 metres...
The installation consists of a central longitudinal rail, two independent transport trolleys and 50...
Moldtech has developed a 5.7 × 2.4 × 3.1 m 3D mould for manufacturing...
Scroll to Top