COMPLETE FACTORY FOR PRE-STRESSED CONCRETE ELEMENTS

  • Universal casting beds and mould sides for the production of “ASSHTO type I beams with stressing heads of 600 TN (1322 KIPS).
  • Double column moulds.
  • Moulds of main beams of 16 m (5.2 ft).
  • Self-stressing double T mould of 36 m (118 ft) and width 2.4 m (7.9 ft).
  • Analysis of the production process and design of factory lay-out.