Workshop testing of the hydraulic mould for the manufacture of bridge girders.
Mold features:
- Height up to 2.6 meters.
- Length up to 39 meters.
- Opening/closing movements are fully automatic and controlled by a hydraulic unit.
- Air vibration system

Workshop testing of the hydraulic mould for the manufacture of bridge girders.
Mold features:

Precast concrete columns are a cornerstone of modern construction, providing the essential vertical support for structures ranging from multi-story buildings...
Why PPVC Material Is Gaining Momentum PPVC (short for prefabricated and prefinished volumetric construction material) combines the best of traditional...
What Are Architectural Precast Panels? Its Importance in Modern Construction When we talk about the building envelope today, we are...