STATIONARY TABLES FOR HALF-SLABS IN HE PHILIPPINES

  • Moldtech has recently built and installed 3 stationary tables in the Philippines.
  • It has consisted of the production of half-slabs to build the bridge decks of the iconic Cebu-Cordova Link Expressway bridge.
  • It will connect Cebu City with Cordova town on Mactan Island.
  • The project is being built by a consortium comprised of Spain-based Acciona and two local partners, First Balfour and DMCI.
  • Moldtech has accomplished the design, fabrication and installation of these tables in a temporary facility at construction site.
  • The tables have been designed with 35×2,5m size and with two collapsible side shuttering bands, as well as a pneumatic vibration system.
Do you want more information?
Contact an expert from our team now

Related Projects

Moldtech has developed a 5.7 × 2.4 × 3.1 m 3D mould for manufacturing...
Moldtech has carried out the technical upgrade of a 3D mould designed to manufacture...
Moldtech has developed a system consisting of a configurable 3D mould for transformer substations...
Moldtech has developed a self-supporting prestressing bed with a maximum capacity of 800 tonnes,...
Scroll to Top