MOULDS FOR PRECAST CONCRETE ELEMENTS FOR CIVIL WORKS

Moldtech has successfully completed another project in Eastern part of Romania. Different moulds were installed for precast concrete elements for infrastructure works.

  • Universal casting bed, 100 meters long, 1,200 mm wide with a foundation pit prestressing system with a capacity of 1,000 tons. Includes active and passive anchorages with relaxing cylinders in the active anchorage. Design of the foundation pit. Tensioning and detensioning equipment.
  • “I”- shaped side moulds, H=0.40 m, length – 20 meters. Pneumatic vibration system.
  • “L”- shaped side moulds, H=0.80 m, length – 6 meters. Pneumatic vibration system.
  • “T”- shaped side moulds, adjustable height from 0.42 m to 0.52 meters, length – 25 meters. Pneumatic vibration system.
  • “I”- shaped side moulds, H=1.10 m, length – 30 meters. Pneumatic vibration system.
  • Modular mould for wet cast casting of culverts of different sections.
  • Mould for separation walls with a minimum height of 2 meters and a maximum height of 3.2 meters.

The supplied equipment gives the client the possibility of manufacturing prestressed girders of different geometries and other precast concrete elements necessary for road infrastructure works.

 

Do you want more information?
Contact an expert from our team now

Related Projects

Two moulds for casting precast concrete foundations for electric vehicle charging stations. The HYC400...
Hydraulic turner designed to rotate precast concrete box culverts through 90° from their casting...
Horizontal mould for casting straight precast concrete staircases with up to 20 steps and...
Set of stressing heads with a maximum stressing capacity of 600 tonnes, designed for...
Scroll to Top