Moulds for box culverts in Spain

The Moldetch team, located in the town of Lerida, Catalonia, Spain, supplies a modular steel formwork system designed for the production of precast frames and semi-frames using dormant concrete. It allows the manufacture of an infinite number of precast dormant concrete sections ranging from 1×1 m to 6×6 m in size.

 

Equipment supplied:

Modular Mould For Sleeping Concrete Frames, specially designed to mould tongue and groove in the same, the assembly and the opening of the mould is manual and it has a system of union of bases with screw and nut.

 

As a locking system for the upper part, spacer tubes with Dywidag rods and nuts are used. The formwork panels are fitted with sealing gaskets to ensure that the mould is sealed.

 

 

Do you want more information?
Contact an expert from our team now

Related Projects

Moldtech has developed a 5.7 × 2.4 × 3.1 m 3D mould for manufacturing...
Moldtech has carried out the technical upgrade of a 3D mould designed to manufacture...
Moldtech has developed a system consisting of a configurable 3D mould for transformer substations...
Moldtech has developed a self-supporting prestressing bed with a maximum capacity of 800 tonnes,...
Scroll to Top