Adaptable 20-Step Horizontal Staircase Mould with Lateral Landing Extensions

Delivered to Portugal in 2024, this horizontal mould system features a 20-step configuration engineered to accommodate variations in thickness, length, and inclination angles. The equipment includes two removable lateral landing extensions that enable overhang production on landings, providing manufacturers with enhanced flexibility for creating diverse staircase designs tailored to individual project specifications.

This specialized solution exemplifies Moldtech’s focus on advancing prefabricated concrete manufacturing technology through innovative design. By combining adaptability with precision engineering, the system allows production facilities to efficiently manufacture staircases that meet varying architectural requirements without sacrificing quality or production speed. With over 30 years of expertise in the prefabrication industry and a track record of successful installations worldwide, Moldtech continues to deliver equipment that empowers manufacturers to expand their product offerings while maintaining competitive advantage in the evolving construction market.

Do you want more information?
Contact an expert from our team now

Related Projects

Supply of two moulds for manufacturing type E1 precast façade elements with fixed dimensions...
Mould for manufacturing non-prestressed precast concrete Inverted Timpan elements in three configurations: T1, T2...
Moldtech has developed a modular side mould system for the production of precast concrete...
Moldtech has developed a mould for the production of precast concrete parapets, designed to...
Scroll to Top