AUTOMATIC LINE FOR THE TRANSPORT AND FINISHING OF PREFABRICATED BATHROOM PODS

The installation consists of a central longitudinal rail, two independent transport trolleys and 50 lateral work and storage cells—25 on each side. The trolleys perform longitudinal movements and transverse transfers with lifting functions to pick up, transport and position prefabricated bathroom pods ranging from 1.9 × 2.1 m to 2.4 × 4 m and weighing approximately 1.6 to 3.7 tonnes. The line can operate in automatic or manual mode and is managed through a centralised HMI control system for selecting origin and destination positions, controlling movements, configuring parameters and monitoring alarms.

Do you want more information?
Contact an expert from our team now

Related Projects

Design and manufacture of a tilting table measuring 22 metres long and 4.4 metres...
Design and manufacture of a pallet circulation system for precast concrete panel production, comprising...
Design and manufacture of a set of prestressing heads with a maximum capacity of...
Supply of two moulds for manufacturing type E1 precast façade elements with fixed dimensions...
Scroll to Top