INSTALATION 2,000 METERS OF HYDRAULIC BEAM MOULDS

  • Production capacity: 30,000 apartments in 2 years. Design of Factory lay-out. Custom made design of moulds and accessories (notch boxes and corbels).
  • Planning of logistics process: design, production, transport, commissioning in 5 months. On site production plant.
Do you want more information?
Contact an expert from our team now

Related Projects

The 3F200 BARRIER MOULD is composed of two side panels, one upper insert and...
The tilting table is composed of three modules, each measuring 12 m in length...
The tilting table consists of one module measuring 13 m in length and 4.5...
Side form mould designed for the production of precast concrete I-girders, engineered for operation...
Scroll to Top