INSTALATION 2,000 METERS OF HYDRAULIC BEAM MOULDS

  • Production capacity: 30,000 apartments in 2 years. Design of Factory lay-out. Custom made design of moulds and accessories (notch boxes and corbels).
  • Planning of logistics process: design, production, transport, commissioning in 5 months. On site production plant.
Do you want more information?
Contact an expert from our team now

Related Projects

The project includes a flexible street mold that’s 50 meters long to make prefabricated...
The installation consists of five (5) fixed tables designed for the production of non-prestressed...
The 3F200 BARRIER MOULD is composed of two side panels, one upper insert and...
The tilting table is composed of three modules, each measuring 12 m in length...
Scroll to Top