Moldtech has supplied a 400-ton self-reacting prestressing bench in Nigeria, designed for the production of long-span and high-strength prestressed concrete beams.
This bench enables the manufacture of beams of up to 52 meters in length and with variable height, meeting the requirements of large-scale infrastructure projects.
The equipment has been designed to work with cable stressing and relaxation systems with a maximum stressing capacity of 400 tons, ensuring precision and reliability throughout the process.
The scope of supply includes:
-
Active and passive head system.
-
High-strength self-supporting structure.
With this project, Moldtech reaffirms its commitment to providing advanced technical solutions for the precast concrete sector worldwide, tailored to the construction challenges of each market.




