This investment was indentified in the strategic plan the company as one of the key point to increase production capacity and adapt to market requests.
The installation of the new sand blasting cabin has been performed in parallel with the expansion works which take place in the production area during the last months which results in the addtion of almost 1000 square meters.
The cabin has internal dimensions of 15x4x4 m which adapts to to the dimensions of the bast majority of the pieces produced within the workshop.
Moldtech can design and produce its machines according to different corrosion protection specifications thanks to the different preparation and coatings methods.
MOLDTECH FOLLOWS A CONTINUOUS IMPROVEMENT PLAN STABLISHED BY THE COMPANY IN ITS CONTINUE PURSUIT OF EXCELLLENCE.
|