MOBILE EQUIPMENT FOR THE IN-SITU PRODUCTION OF PRESTRESSED GIRDERS FOR BRIDGES IN ROMANIA

Facebook
Twitter
LinkedIn
WhatsApp
Email

At Moldtech we have extensive experience in infrastructure projects around the world, including projects for the construction of bridges, highways or viaducts.

The mold to produce bridge beams is composed of a base (universal casting bed system, an existing concrete slab or other type of bottom) and two I-shaped side molds with a quick fixing system with different positions for adjusting the size of the bridge.

The system can also be expanded by acquiring structure extensions, base plates and modular side molds to manufacture different reinforced or prestressed elements.

MORE INFO: Mould for I girders/Bridge girders

Do you want more information?
Contact an expert from our team now

Related Articles

Why PPVC Material Is Gaining Momentum PPVC (short for prefabricated and prefinished volumetric construction material) combines the best of traditional...

What Are Architectural Precast Panels? Its Importance in Modern Construction When we talk about the building envelope today, we are...

Why Tilt-Up Concrete Walls Matter Today We all know that speed and durability are key in modern construction projects. That’s...

Load more

Moldtech Products

Casting beds and moulds for prestressed girders and beams
Accesorios y equipos auxiliares
Load more
Scroll to Top