Moulds for box culverts in Spain

The Moldetch team, located in the town of Lerida, Catalonia, Spain, supplies a modular steel formwork system designed for the production of precast frames and semi-frames using dormant concrete. It allows the manufacture of an infinite number of precast dormant concrete sections ranging from 1×1 m to 6×6 m in size.

 

Equipment supplied:

Modular Mould For Sleeping Concrete Frames, specially designed to mould tongue and groove in the same, the assembly and the opening of the mould is manual and it has a system of union of bases with screw and nut.

 

As a locking system for the upper part, spacer tubes with Dywidag rods and nuts are used. The formwork panels are fitted with sealing gaskets to ensure that the mould is sealed.

 

 

Do you want more information?
Contact an expert from our team now

Related Projects

Moldtech has recently supplied to Romania a 1,400 T self-reacting prestressing system, designed for...
Moldtech has supplied a Type A Footing Mould in Serbia, designed to provide an...
Moldtech has supplied a tilting table in Spain, designed for the production of large-format...
Moldtech has supplied a 400-ton self-reacting prestressing bench in Nigeria, designed for the production...
Scroll to Top