FACTORY FOR THE PRODUCTION OF PRESTRESSED BEAMS AND PANELS

In 2016, Moldtech moves to Gondemaria, municipality of Ouren, in the district of Santarém, Portugal. Here it supplies all the equipment necessary for the manufacture and production of prestressed beams and panels.

 

Equipment supplied:

  • One casting bed of 110 m (360 ft) length with pre-stressing heads of 600 MT (1322 kips).
  • One length adjustable mould for Delta beams  of 30 m (98 ft), 24 m (78 ft), 20 m (66 ft) and 16 m (52 ft).
  • One tilting table for precast concrete panels of 50×2.5 m (164ft x 8.2 ft).

 

 

Our client has been operating in the Portuguese Civil Construction market since 1987. Currently assuming a leading and consolidated position in the supply and production of materials based on precast concrete. Its main value is ethics and respect for people, as well as for the excellent quality of its products and services. These are the values we share at Moldtech.

 

Do you want more information?
Contact an expert from our team now

Related Projects

Moldtech continues to offer innovative solutions for the precast concrete industry by supplying a...
Moldtech has delivered three molds for the serial production of wet cast box culverts,...
Moldtech is supplying a UK customer with as stationary table designed to produce non-prestressed...
Moldtech supplies a new 3D Mould for modular housing 7-5 X 3 M is...
Scroll to Top