Moldtech continues in Portugal, this time, creating a complete plant for the production of prefabricated industrial buildings.
Equipment supplied:
- Pair of tensioning heads of 600 t.
- Casting bed systems of length 100 m for prestressed elements.
- Mould sides for delta beams of 20, 25 and 30 m.
- Mould sides for I beam of heights 0,7, 0,9 and 1,1 m and length with variations each 2,5 m up to 20 m.
- Tilting table of 50 x 2,5 m.
|
All this equipment will allow our client to produce the prefabricated elements necessary for the manufacture of industrial buildings.