MOBILE SELF-STRESSING SYSTEMS TO PRODUCE BRIDGE GIRDERS

Facebook
Twitter
LinkedIn
WhatsApp
Email

Moldtech reaffirms its position as undisputed leader in road and bridge construction equipment.

Previously, we wrote about a self-stressing bridge girder megaproject for the Transylvania highway between Nadaselu and Zimbor in Romania. This project was carried out by the UMB company, a company already consolidated in public works.  The client purchased from Moldtech a complete mobile factory for the production of bridge girders. This project, which also included the supply of other equipment to manufacture different elements such as anti-noise walls, box culverts for highway underpasses and moulds for bridge parapets, became one of the largest in Europe.

After several years since the first agreement between both companies were signed, UMB once again trusts in the experience and know-how of Moldtech. This time it concerns the construction of a road junction in Zimbor, on the A3 highway in Transylvania.

Moldtech has been contracted for the manufacture and installation of two new mobile hydraulic systems for pre-stressed bridge girders.

The casting beds have a maximum length of 125 meters, with the possibility of manufacturing girders of variable heights between 1 meter and 2.4 meters.

The stressing heads supplied can withstand a minimum pre-stressing force of 400 Tn and a maximum force of 1500 Tn.

We thank UMB once again for the trust placed in Moldtech and we are pleased to see the excellent track record of this company in the construction sector.

Moldtech consolidates its leadership as a equipment manufacturer of precast elements for bridge construction and positions itself as a reference in mobile plants for precast elements, providing solutions for projects in different locations.

 

Contact an expert from our team now
Scroll to Top