The Caribbean Island of Curaçao, located near Venezuela, is going to construct a public park where the walkways have to incorporate a large amount of stairs.

    • Instead of using a traditional cast in situ system with wooden shutters the contractor has preferred to use mechanical stair moulds of Moldtech made out of steel as this will make it possible to speed up the project execution time and assure high quality standards.
    • The 6 steel moulds will be shipped in a 20ft standard dry container with a special arrangement to allow easy extraction of the moulds from the containers, thereby avoiding having to use the more expensive Open top containers.
    • The moulds come “ready-for-use” so no installation services are required as the client can install the moulds by himself following the corresponding instruction manual.
Do you want more information?
Contact an expert from our team now

Related Projects

Moldtech has supplied a Type A Footing Mould in Serbia, designed to provide an...
Moldtech has supplied a tilting table in Spain, designed for the production of large-format...
Moldtech has supplied a 400-ton self-reacting prestressing bench in Nigeria, designed for the production...
Moldtech has carried out the supply and installation of two tilting tables in Mexico,...
Scroll to Top