MOBILE PLANT FOR RABAT AIRPORT

In the year 2020 Moldtech signed an agreement with the Menasteel company, located in the industrial zone of Bouznika, Morocco. The objective was the production and installation of equipment that will allow the client to produce all the precast elements for the construction of the new Rabat airport terminal.

All this equipment will allow Menasteel to produce the precast concrete elements for the construction of the parking buildings and the new terminal.

 

Do you want more information?
Contact an expert from our team now

Related Projects

Two moulds for casting precast concrete foundations for electric vehicle charging stations. The HYC400...
Hydraulic turner designed to rotate precast concrete box culverts through 90° from their casting...
Horizontal mould for casting straight precast concrete staircases with up to 20 steps and...
Set of stressing heads with a maximum stressing capacity of 600 tonnes, designed for...
Scroll to Top